Work on the house

We are finally getting city water back to the house but it has been an ordeal and isn’t over yet.  They had to run a ditch down our driveway for the new line and it took a little longer than anticipated.  It is finally in now and hooked up to the house but the water line appears to be frozen at the road so that is slowing things down a bit.  The line to our satellite internet was underneath the driveway and it got cut during the ditch digging process and now the ground is too frozen to install a new line.  I still haven’t figured out that one yet.  I can’t post from school since our filters prevent me from accessing the blog.  I had to make a one day trip into town so I am updating this from my hotel room.  We had our first real snowfall but it warmed back up to around freezing so really it just made a mess. As soon as I can figure my internet out I will post more.

Leave a comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.